According to the White Horse in Neijiang power plant pumps renovation and maintenance of such experiences , needs attention to the following matters .
Transformation can only be carried out in the positive pressure pump
If the vacuum pump ( eg fire pumps ) on the transformation , fillers easily sucked into the pump , stainless steel cable tie the White Horse stage steam turbine power plant has been transformed plant industrial pumps , supplementary pumps, circulating pumps , dredging pumps and boiler shop some of the low-pressure pump , running good effect.
Do not overtighten packing gland
After the installation of tight packing gland packing when not too tight , there should be loose.
Injecting a filler material so that the filler gun , according to the gland packing tightness to determine whether or filled . Tighten the gland by the loose , it means that the filler has been filled .
Filler added
Test pump, leak situation should be based on supplemental filler.
With the pump start , before injection of the filler of the rotary friction part will be extruded to the outside of the pump and generate a certain gap , resulting in leakage. At this time instant injection of filler until no leakage. Injectable fillers should be split into multiple transactions , action should be slow , at intervals of about 5min. If the packing is too tight and smoke , you can loose about packing gland, packing room while pouring cold water to cool . After a period of rotation of the pump , the filler and the sleeve has a good run , will no longer smoke.
Connector on the pump cover the requirements of the injection hole
Hole injection pump cover joints should closely,colored cable ties available raw tape winding , there should be soft gland gasket .
Filled with a filler after the injection pressure connector , and then tightly gland .
Injection can not be forced too fast
Filler gun high pressure ( up to 10MPa), therefore can not be forced when injected too fast , I feel a certain pressure to grip .